The Energy Agency of the State of Campeche (AEEC) has begun designing the State Energy Transition Strategy, with technical support from the French Development Agency (AFD), according to reports published on November 26 and 27, 2026. Campeche is the first state in the country to take part in the Just Energy Transition project promoted by the government of Mexico and the French agency.
The starting point is oil dependence: the state produces just over 50 percent of the country's oil, according to the 2024-2027 State Development Plan. That document warns of effects on employment, tax revenue and the local economy in the event of a reduction in oil activity, and therefore proposes anticipating the shift by drawing on existing capabilities in engineering, maintenance and industrial services. Energía Hoy reports that the national project combines a 100 million euro budget support loan, an agenda agreed with the Mexican authorities and a technical cooperation program of up to 2.4 million euros in non-reimbursable funds. The cooperation takes place in the bicentennial of diplomatic relations between Mexico and France and continues the AFD's work in the country since 2009.
The strategy is organized around six pillars:
- Local employment and training, with academic projections from Tecnológico de Monterrey of up to 40,000 new jobs linked to clean energy by 2030. - Participation of Campeche suppliers in the construction, operation and maintenance of new facilities. - New uses for ports, logistics bases and hydrocarbon infrastructure. - A greater presence of women, who today represent between 20 and 25 percent of the national energy sector workforce, according to Iniciativa Climática de México.
To this is added attention to energy poverty: 87.4 percent of the Campeche population received electricity continuously, compared with 93.2 percent nationally. "Our role is to accompany their goals and facilitate the exchange of knowledge to build solutions suited to their reality," said Alexia Levesque, AFD regional director for Mexico, Cuba and Central America.
The design includes working sessions with institutions, the private sector, civil society and volunteer citizens. The first results of that process will become known as the 2024-2027 State Development Plan moves forward, which sets the expansion of electricity access as one of its priorities.
This article was written with the assistance of artificial intelligence from verified sources and reviewed by a human editor before publication.



