Petróleos Mexicanos (Pemex) and the Comisión Federal de Electricidad (CFE) will concentrate 54.2% of the 2027 infrastructure budget, with 306,896.9 million pesos across 683 projects out of the 566,636.4 million pesos and 1,015 projects in the Programs and Investment Projects (PPI) category, according to an analysis by the Centro de Investigación Económica y Presupuestaria (CIEP) published on November 24, 2026.

The study calculates that total public investment for 2027 amounts to 1.13 trillion pesos, equivalent to 2.9% of GDP, a real reduction of 12.3% compared with what was approved for 2026. Its weight in total net spending goes from 14.2% in 2025 to 12.3% in 2026 and 10.7% in 2027. The decline does not come from public works: financial investment falls 67.7% in real terms, to 92,271.8 million pesos. For Mexico, the figure defines how much remains available for non-energy infrastructure, such as roads, hospitals, schools and water.

The Energía a Debate report details that Pemex will have 248,205.3 million pesos for 222 projects, 43.8% of the PPI, and the CFE 58,691.6 million for 461 projects, 10.4%. The Secretaría de Energía (Sener) contemplates 7,524 million for 12 projects. By number of projects, the CFE leads the list; by amount, Pemex holds first place, followed by Infraestructura, Comunicaciones y Transportes with 125.5 billion (22% of the total).

The study adds that, given the smaller fiscal space, the federal government is proposing private participation schemes. The Ley para el Fomento de la Inversión en Infraestructura Estratégica para el Desarrollo con Bienestar contemplates 188.9 billion pesos from third parties between 2027 and 2032, of which 60.4 billion correspond to 2027, in addition to 273.5 billion in deferred payments concentrated in 2029 and 2030 and 13 public-private partnership projects, eight of them service-provision schemes.

The CIEP argues that, with low growth and reduced fiscal space, the challenge is not only how much is invested but also setting criteria for planning, evaluation and monitoring of long-term contracts. The next milestone is the execution of the 683 energy projects and the first tranche of private investment, scheduled for 2027.

This article was drafted with the assistance of artificial intelligence from verified sources and reviewed by a human editor before publication.